Capacities

Primary Market

All primary capacity at the terminal has been sold through open season processes and is fully contracted.

  • 3.3 million tonnes per annum (mtpa), of capacity has been contracted under Phase 1 on a long term basis from July 2005
  • 6.5 mtpa of capacity has been contracted under Phase 2 on a long term basis from December 2008
  • 5 mtpa of capacity has been contracted under Phase 3 on a long term basis from December 2010

Together these equate to ca. 645 GWh/d regasification capacity, 1,000,000m3 of LNG storage capacity and over 200 berthing slots per annum.

Secondary Market

The regulatory arrangements for Grain shippers requires the primary capacity holders to facilitate secondary trading (berthing slots, storage and regas capacity) to Secondary Shippers.

For enquiries as to the availability of secondary capacity from the current primary capacity holders, please contact the primary capacity holders.

Use It Or Lose It Arrangements

To the extent that primary capacity (or secondary capacity) is not being utilised, in accordance with the terminal’s exemption from Third Party Access requirements Grain LNG operates a ‘Use It Or Lose It’ (UIOLI) process at the terminal. Available quantities of UIOLI capacity are available via the secondary capacity page

Further details are provided on the secondary capacity page.